Replacing of Water Main Lines in Different Areas Projects and for Wells Water Transmission Project ( Riyadh )

As These projects were assigned to AlNimal company by water and sewerage system authority now called (national water company) according to the complete B.O.Q study. In addition to the materials and equipments fleet owns by the company, experienced and qualified staff and financial abilities to cover all requirements of such big projects.
The company has the experience in managing such big projects to maintain the accuracy and supervising all the projects stages by providing all sites with safety’s instruments to ensure traffic solutions coordinating its steps with the competent authorities before commencement of trenches excavations and using the latest methods during replacement of old valves to avoid discontinuance of water supply to citizens follows by replacements of old pipes stage and reinstatements to the original situation under approved consultant nominated by the project’s owner.