Execution of Floods Drainage Project East of Riyadh ( 2nd Part ) Al Gezera Housing Cannal

The work comprise excavation of a box culvert of two and half meter in depth on both ways of the street follows by casting the floor and flat reinforced concrete walls supported by poles in between in addition to infusion of channel ceiling with reinforced concrete as well as the required specifications under supervision of approved consultant nominated by the project owner. The channel can be connected to the future necessary lines with all needed fittings in addition of the water catch basing, maintenance openings and insulation works with bitumen layers for the entire channel, then backfilling the whole trenches. The project’s work completed upon re-asphalting the street, and pavements works in purpose to reinstate to the original condition, then connecting this channel to the channel passing through North East of Riyadh which ends at Khashem Al-Aan Area East of Riyadh where the rainwater flows.

(Sporadic Water Lines Connections (South & East of Riyadh

Sporadic water lines connections is one of the projects which the company has established with the ministry of water and electricity in goal to provide water to all residents in Riyadh city. The company had executed total of 514 Km with diameters range between 63mm to 800mm and the total number of domestic connections are more than 57.700 water house connections.

(Riyadh Water Network (2nd Part

Due to the expansion of Riyadh city in short period which is subsided nowadays, the ministry of agriculture undertakes to provide drinking water to all residents where ever they are. For over 40 years the company execute most of them, therefore it becomes our logo to the most of the residents in Riyadh. This project belongs to Ministry of Agriculture now Ministry of water and electricity.